SFC SPM Loading Buoy Removal

Imenco AS was approached to design and fabricate a 20” Blind Flange Nut Carrier system and a Blind Flange with ROV interface. Positioning and assembly of the blind flange was to be performed subsea by ROV. As part of the testing process, 5 separate Factory Acceptance Tests (FAT) where carried out to verify the performance of the system. Challenges for this project included the angle at which the flange was to be positioned at as well as correct locating of all the flange bolts. Feedback during testing (which was supported by the ROV pilot was that the system was simple and affective. The installation was performed without incident and all parties where satisfied with the end result.

Engineering & Development

Latest news

Imenco buys Malm Orstad AS and will further develop the company

Imenco AS has purchased Malm Orstad AS. The new owner has ambitious development plans for Malm Orstad AS and through the Imenco group's industrial capacity and expertise, the company provides a solid platform for further growth. Read more »

Increasing activity in our main business areas

Smart solutions and a firm foothold in all our main areas mean that the activity is increasing and we want to strengthen ourselves with new employees in several different disciplines. Read more »

Imenco is the new owner of Manoda

Imenco has bought the company Manoda and we are pleased to welcome even more new employees, an extended product range and a new strategic location too the group. Read more »