Imenco AS

Imenco TRI Plate

A smart way to perform loadtransfere subsea or disconnect one lifting rope.

An element that allows for a loadtransfere from one lifting rope to another
• No external power needed, all operations by ROV manipulators
• Easy release subsea, by ROV
• Load tested with lifting certificate.
• Connecting of a Masterlink subsea, by ROV, is possible
• Releasepin is secured against accidental release by a securing lock. (ROV operated)

Latest news

New Guidepost Extension Anchor Releasable

We have developed and produced a new guidepost extension anchor releasable that is ideal to use if the ROV don't have side access to the guideposts on the subsea structure. Read more »

New product GP Centralizer

Through our effort to give our customers new and smart solutions the GP Centralizer has been developed and produced. Based on our experience with subsea lifting & handling we saw the need for this product to make subsea operations even easier and with an increased level of safety. Read more »

New developed semi-automatic TRI Plate from Imenco

A smart solution for easy subsea loadtransfere. The Imenco TRI Plate allows for loadtransfere from one lifting rope to another. Read more »