After the starboard thruster was replaced in 2013, Imenco was a preferred subcontractor for Det Norske for the port side thruster replacement.

In 2014 a pre-study revealed challenges that deviated from the starboard side. The detail engineering was carried through in close cooperation with the customer, and after the best solutions was identified the manufacturing and FAT of an complex winch frame was finished. In addition to delivery of the winch frame, Imenco delivered the extension guide tubes and split-boxes in the thruster room, a new access hatch from main deck and 3 x custom made 25 Te lifting anchors for the thruster subsea lift.

Imenco planned and organized the work packs and supervised the modification works offshore – supplying welders, riggers, NDT operators and necessary equipment. Imenco supervised installation offshore and performed the mechanical completion so the system was ready for operation during spring of 2016.

Feedback from customer is entirely positive. “TRS (Thruster Replacement System) module behaved excellent, no vibrations or sign of weaknesses. Distance to surrounding structure were constant throughout the lift. Everything has gone incredibly well and we are extremely satisfied with what you have delivered”.

Topside

Topside PLUS+

Latest news

Thruster Changeout onboard Alvheim FPSO for Det Norske Oljeselskap

After the starboard thruster was replaced in 2013, Imenco was a preferred subcontractor for Det Norske for the port side thruster replacement. Read more »

Visit us at Korea Offshore 2014

From the 12th to the 14th of November you will find us represented in Busan, at Offshore Korea 2014. Read more »

Reference projects

PIG Handling Trolley

PIG Handling Trolley

The PIG Handling Trolley is designed with a trough for wax and liquids with a possibility to clean/emptying the trough. The trolley is at the level of the receiver to simplify the PIG unloading. This ... Read more »

Rotating Table

Rotating Table

Lifting and Engineering department was approached to redesign test table for Swivivelstack to 200Te load. Production drawings and calculation were prepared by our experienced engineers in cooperation ... Read more »

Featured products